Tor Bridge High needed its fire doorsets installed around the school calendar, with the work programmed to finish before students returned.
JFD worked alongside principal contractor Mercury Construction, with doorsets specified in custom colours for the school.
Defined package received through the principal contractor.
The doorset requirement, including the custom colours, came as part of the wider project package.
A programme built around the return to school.
The installation had to be sequenced so the building would be ready for students coming back, while sharing the site with Mercury Construction’s wider works.
- Work beginsProgramme start
- Installation sequenceArea by area
- Final checksBefore handover
- Students returnStart of term


Custom-coloured doorsets delivered alongside Mercury Construction to a return-to-school programme.
A deadline-led education project where the programme mattered as much as the product.